Research Ore Scanner Mineral Rock
CategoryBasic
Overview
Research 


Research cost: 25 / 25 / 20 (three separate cost entries as recorded).
- Time per item: 20 seconds per item.
Practical notes:
- Treat the three numeric cost entries as distinct resource requirements when planning completion of this research. The available documentation lists them only as numbers; their specific resource types are not documented in the provided source.
- The documented 20 seconds per item is the processing interval associated with the research entry. Account for this interval when estimating total research duration based on the number of items to be processed.
- Because only cost quantities and per-item time are documented, confirm resource types and any additional prerequisites from other authoritative sources before allocating scarce resources.
Other entities of this type
Basic
- Research Advanced Explosives
- Research Advanced Steelmaking
- Research Assembler I
- Research Assembler II
- Research Assembler III
- Research Assembly Lines
- Research Basic Firmarlite Smelting
- Research Basic Infrastructure
- Research Basic Olumite Processing
- Research Basic Steelmaking
- Research Battery (Large)
- Research Battery (Small)
- Research Biomass Farming
- Research Blast Furnace
- Research Burner Generator
- Research Cargo Ships
- Research Cargo Ships (Liquids)
- Research Character Crafting Speed I
- Research Character Crafting Speed II
- Research Character Improvement
- Research Chemical Processing
- Research Circuit Board
- Research Concrete Production
- Research Construction Industry
- Research Container
- Research Conveyor Balancer I
- Research Conveyor Balancer II
- Research Conveyor Balancer III
- Research Conveyor II
- Research Conveyor III
... +95 (see sidebar for full list)