Skip to main content

Research Ore Scanner Mineral Rock

CategoryBasic
Category
Basic

Overview

Research Ore Scanner Ore Rock is a research entry in the research category. The only documented parameters for this entry are the resource costs and the processing time per item as listed in the requirements data.

Research Cost values are presented as three numeric entries: 25, 25, and 20. The time listed for processing is 20 seconds per item. These figures represent the documented inputs needed to complete the research and the per-item time required during the research process.

  • Research cost: 25 / 25 / 20 (three separate cost entries as recorded).
  • Time per item: 20 seconds per item.

Practical notes:

  • Treat the three numeric cost entries as distinct resource requirements when planning completion of this research. The available documentation lists them only as numbers; their specific resource types are not documented in the provided source.
  • The documented 20 seconds per item is the processing interval associated with the research entry. Account for this interval when estimating total research duration based on the number of items to be processed.
  • Because only cost quantities and per-item time are documented, confirm resource types and any additional prerequisites from other authoritative sources before allocating scarce resources.

Other entities of this type

Last updated: