Freight Elevator I

Overview

A freight elevator must be placed in pairs: one top segment and one bottom segment. Together, they form a valid elevator regardless of the height at which they are installed, so the two pieces can be set at any level in the world as long as they are paired correctly. The key requirement is that both ends exist; without the matching segment, the elevator is not considered complete.
In practice, this makes 
Made by (1)
References to this (3)
Other entities of this type
- Advanced Smelter
- Assembler I
- Assembler II
- Assembler III
- Assembly Line Merger
- Assembly Line Painter
- Assembly Line Producer
- Assembly Line Rail
- Assembly Line Splitter
- Assembly Line Start
- Battery (Large)
- Battery (Small)
- Biomass Burner
- Boiler
- Burner Generator
- Cargo Ship Start Pad
- Cargo Ship Start Pad (Liquids)
- Cargo Ship Target Pad
- Cargo Ship Target Pad (Liquids)
- Casting Machine
- Chemical Processor
- Construction Ship Port
- Construction Warehouse
- Container
- Conveyor Balancer I
- Conveyor Balancer II
- Conveyor Balancer III
- Conveyor Balancer IV
- Conveyor I
- Conveyor II
... +72 (see sidebar for full list)
Related pages
- recipeConveyor Balancer I
- recipeFreight Elevator II
- buildingFreight Elevator III
- researchResearch Office Furniture
- recipeRobot Workstation I
- recipeTrain Station
- recipeConstruction Material
- buildingConveyor Balancer IV
- recipeGeothermal Boiler
- recipeMolten Xenoferrite
- researchResearch Assembler II
- researchResearch Conveyor Balancer I