Freight Elevator II
CategoryProcessing

Overview

To function, it must be placed in pairs: one top segment and one bottom segment. Once both pieces are placed, they establish a valid freight elevator, and the two ends can be positioned at any height in the world. This makes it useful for connecting distant depths or surface levels without manually tunneling the full shaft.
- The elevator clears the space between the two placed segments automatically.
- Both the top and bottom parts are required; a single segment does not form a working elevator.
- The two ends do not need to share the same elevation, so it can span large vertical differences.
Made by (1)
References to this (3)
Other entities of this type
Processing
- Advanced Smelter
- Assembler I
- Assembler II
- Assembler III
- Assembly Line Merger
- Assembly Line Painter
- Assembly Line Producer
- Assembly Line Rail
- Assembly Line Splitter
- Assembly Line Start
- Battery (Large)
- Battery (Small)
- Biomass Burner
- Boiler
- Burner Generator
- Cargo Ship Start Pad
- Cargo Ship Start Pad (Liquids)
- Cargo Ship Target Pad
- Cargo Ship Target Pad (Liquids)
- Casting Machine
- Chemical Processor
- Construction Ship Port
- Construction Warehouse
- Container
- Conveyor Balancer I
- Conveyor Balancer II
- Conveyor Balancer III
- Conveyor Balancer IV
- Conveyor I
- Conveyor II
... +72 (see sidebar for full list)
Related pages
- recipeConveyor Balancer I
- recipeFreight Elevator I
- buildingFreight Elevator III
- researchResearch Office Furniture
- recipeRobot Workstation I
- recipeTrain Station
- recipeConstruction Material
- buildingConveyor Balancer IV
- recipeGeothermal Boiler
- recipeMolten Xenoferrite
- researchResearch Assembler II
- researchResearch Conveyor Balancer I